Scheme Metrolink Bury Line Cycle Parking
The Metrolink Bury Line Scheme will provide a series of cycle parking infrastructure along the Metrolink route.
Map instructions and key
The map shows one or more Bee network schemes in your area along with key information about the scheme.
Keyboard users
Map Filter: Tab to the buttons and toggle the layers on and off using the buttons.
Navigating the map: Tab through until you reach a selected map entry, then use the arrow keys to navigate around map entries and use the enter key to reveal the description for that map entry.
Mouse/smartphone users
Map Filter: Toggle the layers on and off using the buttons.
Navigating the map: Use the +/- buttons to zoom in and out, click and drag to move around the map. Select map features with a click or tap to bring up map information.
If using a smartphone: tap and drag with 2 fingers to move around the map. Pinch or open your fingers to zoom in and out. Select map features by tapping on them.
Map key
-
Active neighbourhood
-
Bridge, ramp or other structure
-
Crossing
-
Cycle Hire Station
-
Cycle Hub
-
Cyclops Junction
-
Football
-
Gym
-
Hospital
-
Junction Improvement
-
Library
-
Modal Filter
-
Open Cycle Parking
-
Park or Playground
-
Parklet
-
Protected Junction
-
School
-
Tennis
-
Train Station
-
Tram Station
Get a personalised map:
Show only:
Scheme description
High quality cycle parking facilities on the Bury Metrolink line including covered Sheffield stands with lighting and CCTV in highly visible and accessible locations at nine stops along the Bury Metrolink Line. This will make it easier for people to complete part of their journey by bike before they join the Metrolink network.